The pedestrian and cycle bridge over the railway at Vattentornsvägen (picture below) is closed.
All pedestrian and bicycle traffic is diverted via Snapphanevägen, the diversion is signposted.
The work takes place between 5 August and 13 Octobre.
The pedestrian and cycle bridge over the railway at Vattentornsvägen (picture below) is closed.
All pedestrian and bicycle traffic is diverted via Snapphanevägen, the diversion is signposted.
The work takes place between 5 August and 13 Octobre.